6 projects found for:
Topic: Gas Supply Planning
Testimony Supporting Inputs, Assumptions, and Calculations Regarding AESC 2009 Projections of Avoided Costs
Client: AESC / Massachusetts Avoided Energy Supply Components Study Group
For this project, Synapse prepared testimony describing the major assumptions underlying AESC 2009 and summarizing its major results. Project completed April 2010.
Highlights of the 2009 AESC Report
Client: Vermont Public Service Board
Synapse prepared a presentation for the Vermont Public Service Board describing the major assumptions underlying AESC 2009 and summarizing its major results. Project completed in 2009.
The Electricity Industry at a Glance
Client: National Regulatory Research Institute
The National Regulatory Research Institute (NRRI) retained Synapse to prepare a primer on the U.S. electric industry for public utility commissioners and public utility commission staff. The primer provides basic information on the U.S. electric industry. It assumes only a basic understanding of the nature and purpose of utility regulation. While it addresses issues related to ratemaking, it is not an introduction to rate setting. Section I reviews the overall nature of the industry and of power production and use. Section II breaks down the industry into segments and discusses their recent and current status and organization. Section III (written by Scott Hempling of NRRI) covers regulatory jurisdiction, while Section IV identifies some of the critical issues facing the industry and its regulators. Project completed in November 2008. Download Report
Companion Scenario Analysis
Clients: Conservation Law Foundation, Northeast Energy Efficiency Partnerships
For this project, Synapse reviewed a ISO-NE Scenario Analysis report and developed a Companion Report that evaluated two additional scenarios for greater EE, DR, renewables, and reduced carbon resources. Project completed in 2007. Download Report
Connecticut Natural Gas Rate Case
Client: Connecticut Office of Consumer Counsel
Review gas supply strategy and proposed rate recovery of Connecticut Natural Gas. Download Testimony
Broadwater Energy LNG Terminal Alternatives Analysis
Client: Connecticut Fund for the Environment
Synapse was asked to evaluate alternatives to the Broadwater LNG import facility, proposed as a floating storage and regasification facility to be located in Long Island Sound. Synapse concluded that the region does not have a pressing need for a new baseload resource to provide natural gas, and the region's energy needs for the next decade can readily be met through energy efficiency, implementation of existing renewable energy goals, expanded use of combined heat and power, and repowering of existing power plants. Finally, we found that there are other options for increasing gas supply to the region which would be far preferable to the Broadwater proposal. The most promising of these includes two LNG import facilities already under construction in Eastern Canada, together with the planned expansion of the Maritimes and Northeast pipeline from Eastern Canada into the northeastern United States. Project completed in February 2006. Download Report