Need for a Proposed Transmission Line in York County, Maine

Maine Office of the Public Advocate
Completed July 2003

Synapse reviewed whether Central Maine Power Company's proposed 69 kV transmission was needed to ensure adequate system capability and reliability in York County, Maine or whether a lower voltage line, demand side management, and/or distributed generation would have been adequate.  Synapse also evaluated whether part of the proposed line could have been installed underground or inside existing transmission line rights of way. Project completed in July 2003.