Clean Power Plan Reliability Review

Client:

In 2013, Synapse performed an analysis for the Sustainable FERC Project examining the Eastern Interconnection Planning Collaborative (EIPC) process. The work included a more comprehensive summarization and interpretation of the costs and the benefits of the three modeled scenarios from Phase 2 of the EIPC analyses (1 – nationally implemented federal carbon constraint, 2 – regionally implemented national RPS, 3 – business as usual). Synapse's work addressed key issues not fully fleshed out in the EIPC reports. In 2015, the Union of Concerned Scientists retained Synapse to prepare a new report that synthesized the EIPC modeling results and Synapse’s analysis in the context of the Clean Power Plan.

Status: 
Project completed January 2016