Electric Utility System Reliability Analysis: Determining the Need for Generating Capacity

Client:

Bruce Biewald and Stephen Bernow prepared “Electric Utility System Reliability Analysis: Determining the Need for Generating Capacity” for the Sixth NARUC Biennial Regulatory Information Conference, September 1988.

Status: 
Paper prepared in 1988.